Global Consulting Services
The Howden Ventsim Team can assist with your mine ventilation by providing advice, consulting services, model design and auditing.
We specialise in:
- auditing and validating Ventsim models
- reviewing and recommending assumptions and modelling parameters
- improving ventilation model performance and accuracy
- designing primary and secondary ventilation circuits
- calculating fan design performance and operating parameters
- recommending solutions to solve common ventilation problems
- engaging in mine and ventilation studies
- optimising energy use and power consumption to reduce costs.
Contact us today to further discuss your ventilation requirements.
Mine Ventilation Model Audit
Independent, professional and cost-effective verification of your mine ventilation model
Entrust our experienced Mine Engineers and Ventsim Developers to provide you with a Ventsim Model Audit; an independent, professional and cost-effective service to ensure modelling assumptions and inputs are appropriate for the proposed ventilation design.
This service aims to review and correct settings and assumptions before companies commit to expensive or potentially hazardous changes to actual ventilation systems. Accurate models are also vital for mine schedules, budgeting and forecasting purposes and these can be critical to ensure unexpected changes or expenditure on ventilation redesigns are not required, and mining schedules are not compromised.
Our audit consists of 3 crucial areas of Ventilation Modelling with components reviewed.
1. Airflow Audit – Cost Optimisation:
- Check airway/flow parameters
- Check environmental parameters
- Review fan parameters – fixed flows
- Check obstruction and regulator parameter
2. Thermodynamics:
- Check heat parameters for airways
- Check environmental surface and rock settings
- Review internal diesel, electric and other heat sources and model assumptions
3. Fire Safety:
- Review assumptions of fire and risk
- Review fire design assumptions – size, capacity and behaviour over time
- Review refuge bay locations and escape route parameters
Requirements for Audit
- Ventsim Model
- Fan curves utilised in the mine
- Latest Vent Surveys
Deliverables
- 29 Point Standard Audit Report or 37 Point Full Audit Report (including Thermodynamics), showing compliance or non-compliance in all areas of the model. Where incorrect parameters are detected, the consequence and recommendations to improve will be stated.
- 30 minutes conference call to discuss the findings of the report
- An additional fire and safety report if required, reviewing and if required amending fire design assumptions and showing fire simulation and emergency outcomes based on proposed plans
Additional Services
- Up skilling and tailored training for individuals or teams
- Ventilation design review, engineering and/or advice
- Full turn-key ventilation design services
Benefits
- Peace of mind
- Reduced workload
- Avoidance of costly mistakes
- Reallocation of budget
- Time savings
- Close your skill gap
Want more information? Email us to learn more.